tower event solutions

Tower Event Solutions

Unit 8

Forth Industrial Centre

Sealcarr Street

Edinburgh EH5 1RF

T: 0131 552 0100

F: 0131 552 0200


info@tower-productions.com
hires@tower-productions.com


Twitter

heating



HEATERS

  • 18kW three-phase electric heater
    3 heat and 1 fan only setting. Finished in white. 32A three-phase cee-form connector.
    Modes: 9kW, 13.5kW, 18kW
  • 20kW three-phase electric heater
    3 heat and 1 fan only setting. Finished in white. 32A three-phase cee-form connector.
    Modes: 10kW, 15kW, 20kW
  • IMA61 c/w flue, Chinese hat, thermostat, fuel line
    65kW output, thermostatically controlled.
    Supplied: remote thermostat, flue, lenth ducting (x1), diffuser (x1).
  • IMA111 c/w flue, Chinese hat, thermostat, fuel line
    110kW output, thermostatically controlled.
    Supplied: remote thermostat, flue, lenth ducting (x1), diffuser (x1).

DUCTING & DIFFUSERS


    IMA61:

  • 3m x 300mm flexible ducting
  • 6m x 300mm flexible ducting
  • 3m x 400mm flexible ducting
  • 6m x 400mm flexible ducting
  • 300mm ducting joiner (hard)
  • 400mm ducting joiner (hard)
  • 400mm to 300mm ducting reducer (hard)
  • 300mm to 2x 300mm ducting 'Y' split (hard)
  • 400mm to 2x 300mm ducting 'Y' split (hard)
  • 300mm diffuser - white
  • 400mm diffuser - white
  • Ducting strap - black
  • IMA111:

  • 3m x 360mm flexible ducting
  • 6m x 360mm flexible ducting
  • 3m x 500mm flexible ducting
  • 500mm ducting joiner (hard)
  • 500mm to 360mm ducting reducer (hard)
  • 500mm to 2x 360mm ducting 'Y' split (hard)
  • 360mm diffuser - white
  • Ducting strap - black

FUEL HANDLING

  • Fuel line 'Y' split
  • 110 litre Dieselmate c/w 100 litres of Diesel